theCollaborative 1881 is a transit-oriented development (TOD) located 3 stops from downtown Salt Lake. The site is easily accessible from I-80 and I-215, minutes from the Airport, just over a half mile from Cottonwood Park, and walkable to numerous retail dining options.
The site was identified by Defy Tech, assembled and secured by Defy Land, designed by Defy Design, and then sold as a LIHTC development project.